Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the translatepress-multilingual domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/poologod/public_html/wp-includes/functions.php on line 6114
House Builders - Pool Void Covers® | Engineer-designed hard pool cover

房屋建筑商

我们与数百家房屋建筑商合作,确保您的泳池安全。

我们的系统是工程师设计评级系统 - 我们向您的现场经理/安全官员提供 Form 15 工程证书*、完整的工程文件、保险证书和责任副本。

我们完成所有入职要求 - 包括现场安全表格和合规文件。

(*) – 您的房屋建筑商将要求您提供 Form 15 工程证书 – 其中包括系统工程设计规范。
Be aware of any supplier that offers a Form 15 manufacturing certificate that is supplied by retailers (such as Bunnings !!).
These are not accepted by house builder site managers/safety officers.

与我们合作过的住宅建筑商

Queensland

与我们合作过的住宅建筑商

Victoria

系统流程

我们的工作流程

在整个过程中,从最初的报价查询到安装和复员——我们友好的专业团队将为您提供所有正确的建议、文件和认证。

Pool Void_45Pool Void Cover Installed_45

引用

我们收到您对 Pool Void Cover® 的询问,澄清信息并报价适合您的泳池和房屋建造的工程解决方案。

安装

我们完成现场检查并测量并安装您的 Pool Void Cover®。

Pool Void_77Pool Void Cover Installed_77_2
Pool Void_38Pool Void Cover Installed_38

Check & Sign-off

We review the installation and supply a signed engineering certificare.

zh_CN